Category / Architecture Blog / 2018 / Architecture Blog / mews development / Residential New Build

    Loading posts...
  • A Bird’s Eye View of Koops Mills Mews

      Koops Mills Mews is a mixed use development completed in June 2015, it consists of around 2,500 sq/ft of ground floor commercial units, seven residential flats and a standalone studio house.   Situated on a Grade II Listed 19th Century former tannery mill, the site was met by very tight constraints. The site is…

  • New Houses Near Completion in Croydon

    Two houses located on Lower Addiscombe Road, Croydon we designed and obtained planning permission for are nearing completion. The unusual back-lands site dated back to the 19th Century when an out-building was constructed for a large lodge. Following demolition of the lodge the surrounding land was developed with new residential houses leaving it isolated in a back lands…

  • Technical Design – Koops Mill Mews, London, SE1

    The commencement of the RIBA stage 4 Technical Design with part RIBA Stage 3 Developed Design modifications began in October 2013. The duration of construction has lasted 14 months, completed in June 2015.   Types of Construction Owing to its site constraints, the building was constructed in steel framed primary structure with precast concrete hollowcore…